Construction of this new Fort Bend County Service Center consists of eight new buildings. They include an EMS facility, a county tax office branch, and a county service center that will have equipment storage facilities, State-of-the-Art equipment repair facilities, fueling depot and high pressure wash/cleaning facilities.
This 10,000 s.f. addition consists of using a pre-engineered metal building by Whirlwind Steel Buildings, Inc. The design on the building incorporates the architectural elements of the surrounding buildings. The building features six drive-thru bays with 20´ overhead doors. The interior amenities include office space; bay readiant heaters; two posts and for post lifts; 2,500 s.f. of storage on lightweight concrete mezzanine; hose reels and high output lighting.