Bob Bass has lived and worked in the construction industry for most of his life. His father started Bass Construction in 1957 when Bob was very young. Bob worked on weekends and during summers, learning the skills and philosophies on which the company was founded.

After graduating from Texas A&M University, Bob became an “official” employee of Bass Construction, and he worked alongside Nelson Bass for 30 years. It’s no wonder some of those positive traits rubbed off! Bob is often described as honest, dedicated and accommodating.

Today, Bob is responsible for managing the office and overseeing projects. Although his daily duties now include more leadership roles, he’s not afraid to roll up his sleeves and get his hands dirty. In fact, one of his favorite parts of the project is value engineering because he likes for his clients to get the most for their money.

PROFESSIONAL/COMMUNITY INVOLVEMENT

  • Associated Builders and Contractors of Greater Houston
  • Jack Miller Network
  • Butler Manufacturing Co.
  • Butler Builder Advisory Council
  • Rosenberg-Richmond Area Chamber of Commerce
  • American Red Cross
  • Lamar Educational Awards Foundation supporter

EDUCATION

Bachelor of Science in Building Construction, Texas A&M University Graduated with Honors, 1972

AT A GLANCE

  • Second generation owner. Worked alongside his father and company founder, Nelson I. Bass, Jr. for 30 years.
  • Responsible for overall office and project leadership, including pre-construction services, estimating and planning.
  • Hobbies include sports, fishing and hunting.
  • How Bob describes his approach to his work: “It’s a marathon, not a sprint!”

NOTEWORTHY PROJECTS

South Texas Nuclear Plant

Civil project involving stringent security measures, which included casting 1,960 5x10x4 concrete blocks on site, setting them in place at the perimeter of the secured area within a 60-day timeframe.

Albis Plastics

This 80,000 square foot plastics facility was a design-build project completed in 1990 for a German company operating in Rosenberg. At the time, it was the largest job in size and cost Bass had completed.

Dub Miller Ford

Four-building design-build project totaling 80,000 square feet of pre-engineered steel buildings, including five acres of paving. Completed in 2002.

Lamar CISD – George Jr. High/Terry High School Renovations

Complete renovation of George Jr. High was accomplished in only 75 days. A partial renovation of Terry High School, including new mechanical and sprinkler systems, was completed in this same timeframe.

Lamar CISD – Jane Long Elementary/Special Need Renovations

2008 project on two campuses involving renovating the Special Needs Building and a new 30,000 square foot class room / gym addition to Jane Long Elementary.

Contact Us

Bass Construction Co.

1124 Damon St.
Rosenberg, TX 77471
Phone: 281.342.2022
Fax: 281.341.5071
Email : contactus@bassconstruction.com

About Us

Honesty. Integrity. Precision. These guiding principles laid a solid foundation upon which Bass Construction was built. And, they are qualities on which the company still thrives. This time-honored tradition was started by a man known for his attention to detail and fairness with everyone – from his clients and employees to subcontractors and suppliers.

Read more..

News