Air Seal

Bass Construction

Design Build of a complete manufacturing facility.  The project featured a building manufactured by Liberty Building Systems.  The project included site work, detention pond, water well, septic system, truck well, parking lots, manufacturing area, shop office and facility office areas.

The building featured a 10 ton 57’ span overhead electric crane. Electrical designed for welding outlets, shears and breaks.  Design included air lines and future paint booth.

Completed: 2007

Location: Stafford, TX

Architect: TKW Designs

Client: Wal-Pat Warehouse Leasing